Apenas um em cada dez dos seus materiais de MRO está, de facto, a ser planeado. Os outros nove estão a custar-lhe dinheiro

Índice

A food manufacturer with 40 plants recently pulled two numbers from SAP. The first: about 1.7 million material-plant records in the MRO master. The second: the materials under active reorder-point planning – roughly one in ten. Nobody had decided that the other 90% should sit outside planning. It had happened gradually, one plant and one year at a time.
This is the inventory problem that conventional MRO inventory optimization programmes often miss. The issue is not simply how much stock a manufacturer holds. It is how much of its material base is actually governed by a replenishment policy.

ndustrial warehouse shelves representing MRO inventory optimization and SAP material planning gaps

TL;DR

  • In many multi-plant manufacturers, only about 10% of MRO material-plant records are under active replenishment planning. The remaining records may still carry stock, value and duplicates that no reorder point will address.
  • You can establish your own ratio in SAP by comparing total material-plant records with records assigned a planning-relevant MRP type, then examining stock on hand for the unplanned set.
  • The safest starting point is not a network-wide programme. It is one plant, a structured calibration period and planner review of every recommendation before the approach is extended to other facilities.

MRO Material Planning in SAP: How Many Materials Are Actually Being Planned?

Fewer materials are actively planned than most manufacturers expect. An MRO material master expands through ordinary operational decisions: a part is created for a project, extended to a plant, purchased once and never retired. Mergers introduce additional numbering schemes. Plant autonomy creates local records for materials that may already exist elsewhere in the network.
After a decade of these decisions, the master can contain millions of material-plant combinations. Yet only the records governed by a replenishment method, such as reorder-point planning or another planning-relevant MRP type, are actively managed through those parameters. Other records may be deliberately non-stock, but many are simply outside the planning process.
The ratio is a useful diagnostic, not a universal performance benchmark. In the source example, roughly one in ten records was under active planning. A ratio closer to one in five may indicate broader planning coverage in some environments, while one in twenty points to a much larger review requirement. The right interpretation depends on the material population, operating model and the proportion intentionally managed as non-stock.
A practical first check: ask your SAP team for two counts: total material-plant records and records assigned a planning-relevant MRP type. The source draft lists VB, VM, V1, V2 and PD as examples; validate the relevant types against your SAP configuration before using them in the extract. Compare the two counts, then examine stock on hand for the unplanned set.
That comparison gives the materials team a starting point for MRO inventory analysis: the scale of the unplanned population, the stock value attached to it and the records that warrant further review.

The Cost of Unplanned MRO Inventory

An unplanned material is not necessarily an empty bin. A material can sit outside reorder-point planning and still carry stock, value on the balance sheet and have an equivalent part recorded under another number at a different plant. This is why unplanned MRO materials can create cost even when no immediate stock-out is visible.
Three costs tend to follow:

  • Dead stock and excess holdings. Materials outside active planning may retain stock without a parameter that triggers a structured replenishment or reduction review. Excess and obsolete inventory can remain in the storeroom because no planning rule is recalculating what the plant needs.
  • Duplicate purchasing across plants. The same bearing or other spare part may exist under multiple material numbers across facilities. Without a network-level view, each plant can purchase locally even when usable stock is available elsewhere. The result can be avoidable buying, transfers that are never considered and, at times, emergency procurement.
  • Planner attention directed at the visible minority. Exception messages and parameter reviews tend to concentrate on the materials already inside the planning process. The unplanned population can remain outside routine scrutiny, even when it represents substantial working capital.

These costs do not always appear as a direct write-off. They can accumulate as working capital tied up in slow-moving stock, avoidable purchase orders and material records that obscure what the network already owns.
The source draft references benchmarks of 25–40% for excess and obsolete MRO holdings and emergency purchasing premiums of 50–80%. Those figures should be supported by verifiable sources before publication; otherwise, retain the cost mechanisms without publishing the unsourced ranges.

See Your Data in Action

See what a six-week, one-plant calibration pilot could look like on your data. Book a 30-minute scoping call.

Marque uma chamada de consulta sem compromisso com a nossa equipa de implementação para abordar os desafios relacionados com a gestão de dados mestre

MRO Inventory Optimization Across Multiple Plants

A multi-site inventory optimization programme does not need to begin across the entire network. Starting with every plant at once increases the number of local rules, data conditions and planner exceptions that must be reconciled before the approach has been calibrated.
The manufacturers that make progress start with one representative plant. They use the first deployment to understand how planners apply criticality, safety stock, lead-time assumptions and reorder points. The configuration is reviewed against operational judgement before it is carried to the next facility.
A six-week, one-plant calibration can be structured as follows:

Period Activity Resultado
Week 1 Agree the data template and run a workshop with planners on current safety-stock, criticality and reorder-point practices. Documented planning rules and agreed data requirements.
Week 2 Load the plant extract and score data quality by field. Review preliminary outputs alongside current values. Baseline data-quality view and initial comparison.
Weeks 3–5 Recompute forecasts, safety stock, reorder points and min/max levels for the plant. Review overstock and understock variances and assess critical items with planners. Reviewed recommendations and documented exceptions.
Week 6 Conduct a readout with materials and reliability teams, benchmark the approach and estimate the effort required to scale. Calibrated configuration and a network scale-up estimate.

How can manufacturers identify duplicate spare parts across multiple plants?Each recommendation should carry its supporting evidence and an approve/reject decision. A rejection is not simply a failed recommendation; it records where the model’s assumptions differ from the plant’s operating reality. Planner feedback becomes part of the calibration process. The next plant can then start from a reviewed configuration rather than repeating the same discovery work.
This is the practical distinction between isolated plant-level MRO inventory management and a repeatable multi-plant spare parts management approach: local operating rules are understood first, then translated into a controlled method that can be evaluated across facilities.

MRO Inventory Planning Recommendations: What Should You Do This Week?

  1. Establish the baseline. Pull the total material-plant record count and the count assigned a planning-relevant MRP type. Calculate the share under active planning and identify the unplanned population.
  2. Quantify the exposure. For the unplanned set, examine stock on hand, inventory value and last movement date. This separates records with no stock from materials that may be tying up working capital.
  3. Choose a representative pilot plant. Prioritize a facility where transaction volume, purchase-order cancellations or inter-plant transfers could make the review operationally meaningful.
  4. Protect critical spares. Agree which critical items must be shielded from indiscriminate inventory reduction. Make the rule explicit and require every recommendation to demonstrate how it treats those items.
  5. Make recommendations explainable. Require the current parameter, proposed parameter and supporting reason to be visible side by side. If planners cannot assess the recommendation, adoption will be limited.

The objective is not to reduce every stock balance. It is to improve MRO inventory management by distinguishing justified inventory from stock that has accumulated without a current planning rationale.

How Verdantis Approaches the Planning Gap

Verdantis approaches this problem through a plant-first calibration process supported by MRO360. The work begins with the material and plant data, then evaluates planning parameters and inventory conditions against the rules used by the materials and reliability teams.
Recommendations are presented for planner review, with evidence and an approve/reject decision. That review is central to the process: the aim is to establish a configuration that reflects the plant’s operating requirements before extending it to other facilities. This supports MRO inventory reduction through better planning, stock redeployment and replenishment decisions rather than treating write-offs as the default route.
See what a six-week, one-plant calibration pilot could look like on your data. Book a 30-minute scoping call

Perguntas frequentes

1. What are unplanned MRO materials in SAP?

An unplanned MRO material is a material-plant record that is not governed by a planning-relevant MRP type or replenishment parameter. It may still hold stock and inventory value; it is simply outside the automated replenishment logic and may be absent from routine planning reviews.

2. How do you conduct MRO inventory analysis?

Start by comparing total material-plant records with records assigned a planning-relevant MRP type. For the unplanned set, add stock on hand, inventory value and last movement date. This provides an initial view of the population, its financial exposure and its dormancy. Validate the extract and planning-type definitions against your SAP configuration.

3. How can MRO inventory reduction happen without write-offs?

Potential actions include redeploying usable stock between plants, cancelling open purchase orders where network stock can meet demand, returning eligible excess to vendors and adjusting replenishment parameters so inventory is consumed down. Write-offs may still be necessary in some cases, but they should not be assumed to be the first or only option.

4. How do you approach multi-plant MRO inventory optimization? 

Begin with one representative plant, review the data and planning rules with local teams, and calibrate recommendations through planner approval. Once the approach reflects the plant’s operating requirements, carry the reviewed configuration to other facilities and account for their local differences

5. How does MRO inventory optimization help reduce excess stock?

MRO inventory optimization analyzes demand patterns, reorder points, safety stock, supplier lead times and inventory availability to identify excess materials and improve replenishment decisions.

6. How can manufacturers identify duplicate spare parts across multiple plants?

Manufacturers can analyze material descriptions, part numbers, specifications and stock availability across facilities to identify duplicate records and opportunities for inventory consolidation or inter-plant transfers. 

7. How does MRO inventory optimization help reduce excess stock?

MRO inventory optimization analyzes demand patterns, reorder points, safety stock, supplier lead times and inventory availability to identify excess materials and improve replenishment decisions.

8. How can manufacturers identify duplicate spare parts across multiple plants?

Manufacturers can analyze material descriptions, part numbers, specifications and stock availability across facilities to identify duplicate records and opportunities for inventory consolidation or inter-plant transfers

A Two-Number Diagnostic for Your MRO Inventory

Your plants may be holding materials that have never been brought into a formal planning process. Start with two SAP counts: total material-plant records and records assigned a planning-relevant MRP type. Share the figures with Verdantis to understand what the gap may indicate and where a one-plant review could begin.
Download the MRO360 data template to see which fields the six-week pilot requires from SAP.

Sobre o autor

Imagem do Kumar Gaurav

Kumar Gaurav

Na qualidade de CEO da Verdantis, Kumar desempenha um papel fundamental na definição da orientação estratégica da empresa, na expansão da sua presença no mercado e na promoção da inovação no domínio da Gestão de Dados Mestres. Kumar é um empreendedor experiente e um líder transformador com mais de duas décadas de experiência. É especialista em orientar os clientes na sua jornada digital através de soluções inovadoras. Com uma sólida experiência em liderança de vendas e gestão de conglomerados complexos, Kumar destaca-se na gestão de resultados financeiros. É conhecido pela sua consultoria estratégica nos setores do retalho, comércio eletrónico e educação, bem como pela sua habilidade em alinhar diversas partes interessadas em torno de objetivos comuns no âmbito de estruturas organizacionais matriciais.

Artigos relacionados

Marcar uma demonstração

Descarregar o ficheiro

Os seus dados estão protegidos por nós ao abrigo do nosso acordo de confidencialidade 100%.

Gestão de dados mestre de MRO para uma empresa líder no setor do petróleo e gás, com um volume de negócios de $12Bn

As empresas do setor do petróleo e do gás enfrentam enormes custos indesejados sob a forma de perdas, multas e indemnizações decorrentes de acidentes de trabalho, o que lhes retira uma parte considerável das suas receitas. Uma das principais razões para as falhas e os acidentes é a avaria de infraestruturas industriais essenciais, resultante de uma gestão ineficaz da base material e de ineficiências na cadeia de abastecimento de MRO, que são extremamente críticas para os ciclos de produção e manutenção.

Cada vez mais organizações procuram agora implementar sistemas de Gestão de Dados Mestres (MDM), com o objetivo de gerir os seus ativos através de uma tomada de decisões informada, baseada em dados fiáveis, e garantir uma segurança industrial ótima em toda a empresa.

Sobre a empresa:

Isto A empresa sediada nos EUA é líder mundial no fornecimento de componentes mecânicos essenciais para plataformas de perfuração terrestres e offshore, plataformas completas de perfuração e manutenção de poços, bem como uma gama abrangente de serviços de inspeção de tubos, revestimentos internos, equipamento para colunas de perfuração, equipamento de elevação e manuseamento e ferramentas de perfuração de fundo de poço. Oferece ainda serviços de cadeia de abastecimento através de centros de distribuição estrategicamente localizados perto dos principais locais de perfuração e produção em todo o mundo. Com mais de 800 centros de produção, vendas e assistência em todo o mundo e receitas anuais superior a $12 mil milhões, a empresa fornece soluções centradas no cliente e adaptadas às necessidades do setor energético em termos de qualidade, produtividade e ambiente.

Desafios relacionados com os dados mestre de materiais

A empresa enfrentou desafios significativos no que diz respeito aos seus dados mestre.
• Falta de coerência e de normas relativas aos dados mestre
• Campos de atributos do ficheiro mestre incorretos, incompletos, não classificados e desatualizados
dados Grandes volumes de dados em várias línguas
• Várias instâncias de ERP e outros sistemas legados em toda a empresa
• Descrições de materiais mal estruturadas
• Falta de governação de dados e de colaboração entre divisões multifuncionais e locais

Solução e resultados alcançados

Solução: Harmonização e manutenção contínua dos dados mestre de materiais

A empresa implementou Material Verdantis Harmonize para limpar e enriquecer os seus dados mestre históricos. Utilizando ferramentas baseadas em IA e o Repositório de Conteúdos da Verdantis, a solução classificou, normalizou e eliminou os materiais duplicados.

Depois de os dados terem sido harmonizados, Integridade dos Materiais da Verdantis foi implementado para a gestão contínua dos dados. Assegurou a precisão contínua dos dados através de validação em tempo real, classificação baseada em IA e prevenção de duplicações, garantindo uma elevada qualidade dos dados em todos os sistemas da empresa.

Principais medidas tomadas:

  • Classificado 150 000 materiais em 1 210 UNSPSC e Mais de 500 HTS códigos
  • Atributos de materiais não estruturados, analisados e normalizados
  • Eliminámos as duplicatas e melhorámos as descrições dos materiais
  • Estabeleceu a gestão de dados em tempo real e os fluxos de trabalho de aprovação
  • Criou um repositório centralizado para o acesso a dados por parte de várias funções

Resultados alcançados:

  • Maior precisão dos dados – Eliminaram-se registos de material duplicados e inconsistentes
  • Classificação melhorada – Materiais normalizados com códigos UNSPSC e HTS
    Melhor gestão de stock – Visibilidade e utilização otimizadas do stock
  • Aquisições e conformidade mais rápidas – Permitiu uma pesquisa de materiais sem complicações e o cumprimento da regulamentação
  • Governança Sustentável de Dados – Garantia de precisão contínua através de uma manutenção baseada em IA
  • Tomada de decisões informadas – Repositório centralizado de dados para uma maior eficiência operacional

Ao integrar Harmonização e integridade dos materiais, a empresa alcançou um estrutura de gestão de dados mestres escalável e baseada em IA, garantindo a sustentabilidade a longo prazo coerência dos dados, eficiência e conformidade.

Os seus dados estão seguros e são utilizados exclusivamente para os fins previstos. Damos prioridade à sua privacidade e protegemos as suas informações.