Global gold miner

Five mines, five SAP instances, one view of every spare.

~$26M
working capital released
47%
less emergency procurement
10 wks
to go live, SAP kept
Read the story
Product
Solutions
Customers
Resources
Company
Book a demoGet a free diagnostic

MRO inventory case studies MRO360 results, measured on customers' own data.

Every story is anonymised at the customer's request. Each one says whether its figures were measured after go-live or come from a validated business case, so you know exactly what you're reading.

Measuredresults after go-live, on the customer's own data
Business casevalidated before deployment, often with finance
Diagnosticfound in the customer's extract within days

MRO360 customer stories by industry.

Filter by industry, or show only results measured after go-live.

Measured at 12 months5 mine sites, 3 continents, 5 SAP ECC instances

Five mines, one view of every spare part.

Global tier-1 gold and copper miner

~$26Mworking capital released
47%less emergency procurement
Zerocritical parts missed at shutdown
Read the case study
Measured at 12 months16 production sites, 5 regions, SAP S/4HANA and SAP PM

Every seasonal campaign covered, across 16 plants.

Global confectionery and food manufacturer

~$16Mworking capital released
43%less emergency spend
Zerofood-safety substitution failures
Read the case study
Results reported as ranges~18 sites, mixed SAP and legacy CMMS

Turnarounds de-risked across a lithium, bromine and catalyst network.

Global specialty chemicals manufacturer

$10–40Mworking capital released
40–60%less emergency procurement
99%+turnaround parts availability
Read the case study
Validated business caseMultiple complex refineries on SAP

An MRO case the CFO could audit line by line.

North American multi-refinery fuels producer

Auditedbase taken from the operator's own filings
~10%reduction target vs 30–45% benchmarks
~30%/yrrecurring benefit vs one-time release
Read the case study
Validated business caseEnterprise-wide, multi-site, nine-figure spares inventory

From insight to executed value, across an acquisition-grown estate.

Large North American energy operator

~12×recurring benefit vs annual subscription
<6 monthspayback on recurring benefit
~5%conservative reduction target
Read the case study
Validated engagement design~20,000 SKUs across 40–50 stations and storerooms

Value before the truck arrives: open POs first, parameters second.

North American electric and gas utility

Before receiptopen POs cancelled or filled by transfer
~⅓ / yrrecurring benefit vs one-time release
Ring-fencedstorm-response spares
Read the case study
Diagnostic from the customer's extractMulti-site estate after a major combination

The 42% no one had measured.

Multinational mill-based manufacturer

42%of inventory value unmoved in 24 months
~½of analysed inventory addressable
Daysfrom extract to validated findings
Read the case study
Validated business caseMulti-site network on a single ERP

Two scenarios, one clear answer.

Leading Latin American consumer-goods manufacturer

<6 monthspayback in either scenario
~4.5×return on the network modules
~70%uplift in three-year net benefit
Read the case study
Looking for an earlier project?Every customer story we have published, including earlier work with Verdantis, is in the case study library.
Open the case study library

Your numbers, next.

Every story above started with one extract. Send yours and see what your storerooms hold, in dollars, within days.

Material master + movements extract
ExcessDuplicatesTransfers

Request a free diagnostic

An MRO specialist will set up a secure upload and walk you through the findings.

Request received. Pick a time for your kickoff call.

A short call with an MRO specialist. We'll also email a secure link for your extract.

Open the calendar in a new tab

Book A Demo

MRO Master Data Management for a leading $12Bn Oil and Gas company

Oil and Gas organizations face huge unwanted costs in the form of losses, penalties and compensation due to industrial accidents, taking a sizable chunk of their revenues. One of the important reasons for failures and accidents is the breakdown of key industrial infrastructure arising from ineffective management of the material base and inefficiencies in the MRO supply chain that are highly critical for the production and maintenance cycles.

More and more organizations are now looking to establish Master Data Management (MDM) implementations in order to manage their assets through informed decision-making based on reliable data and ensure optimal industrial safety across the enterprise.

About the company:

This US based company is a global leader in providing essential mechanical components for both land and offshore drilling rigs, complete drilling and well servicing rigs, as well as a comprehensive range of tubular inspection, internal coatings, drill string equipment, lifting and handling gear, and downhole drilling tools. It also offers supply chain services through distribution centers strategically located near major drilling and production sites worldwide. With over 800 manufacturing, sales, and service centers globally and annual revenues exceeding $12 billion, the company delivers customer-focused solutions tailored to meet the energy industry’s quality, productivity, and environmental needs.

Material Master Data Challenges

The company faced significant challenges with their master data.
• Lack of consistency and standards for the master data
• Incorrect, incomplete, unclassified and outdated attribute fields of master
data High volumes of data in multiple languages
• Multiple ERP and other legacy instances across the company
• Poorly structured material descriptions
• Lack of data governance and collaboration across cross-functional divisions and locations

Solution & Results Achieved

Solution: Material Master Data Harmonization & Ongoing Maintenance

The company implemented Verdantis Material Harmonize to cleanse and enrich its historical material master data. Using AI-powered tools and the Verdantis Content Repository, the solution classified, standardized, and eliminated duplicate materials.

Once the data was harmonized, Verdantis Material Integrity was deployed for ongoing data governance. It ensured continuous data accuracy through real-time validation, AI-driven classification, and duplication prevention, maintaining high data quality across enterprise systems.

Key Actions Taken:

  • Classified 150,000 materials into 1,210 UNSPSC and 500+ HTS codes
  • Parsed and normalized unstructured material attributes
  • Eliminated duplicates and enriched material descriptions
  • Established real-time data governance and approval workflows
  • Created a centralized repository for cross-functional data access

Results Achieved:

  • Improved Data Accuracy – Eliminated duplicate and inconsistent material records
  • Enhanced Classification – Standardized materials with UNSPSC & HTS codes
    Better Inventory Management – Optimized stock visibility and usage
  • Faster Procurement & Compliance – Enabled seamless material search & regulatory adherence
  • Sustainable Data Governance – Ensured ongoing accuracy with AI-driven maintenance
  • Informed Decision-Making – Centralized data repository for improved operational efficiency

By integrating Material Harmonize & Material Integrity, the company achieved a scalable, AI-powered Master Data Management framework, ensuring long-term data consistency, efficiency, and compliance.

Your data is secure and used solely for intended purposes. We prioritize your privacy and protect your information.