Talk to Verdantis — Get the 2026 Spare Parts Maturity Index Report
CONTACT / LET'S TALK EAM

The 2026 Spare Parts
Maturity Index Report is out.

Benchmark your maintenance inventory across 6 dimensions — criticality, demand, stockouts, dead stock, data, and predictive maintenance. Download the report, take the live 60-second assessment, or run an MRO360 POC on your own data.

NEW · 2026 INDUSTRY REPORT 48 PAGES · PDF

See where your spare parts operation stacks up against 400+ industrial plants.

The Verdantis 2026 Spare Parts Maturity Index Report distills data from chemicals, oil & gas, mining, and discrete manufacturing into a single benchmarking framework — with tier-by-tier roadmaps and quantified savings potential.

  • What's inside: tier definitions (Reactive → Optimized), industry-specific benchmarks, and a self-scoring framework you can run internally.
  • A working 90-day roadmap for each maturity tier — what to fix first, and the typical ROI window.
  • Quantified savings: average inventory reduction, downtime recovery, and expediting costs eliminated per tier.

Request your copy

Emailed within 4 business hours.

94% delivered same-day
Want to score yourself right now? Take the 60-second live assessment below.
Jump to assessment →
Or score yourself live · 60 seconds

The Spare Parts Maturity Index, in 6 questions.

Answer six questions about your current maintenance inventory operation. You'll get a maturity tier, a dimension-by-dimension breakdown, and the option to run MRO360 on your own sample data.

MI

Live Maturity Assessment

6 questions · ~60 seconds · industry-benchmarked

Q1 / 6
01 · CRITICALITY

How does your org determine which spares are critical?

02 · DEMAND FORECASTING

How do you forecast spare parts demand?

03 · STOCKOUT CONTROL

How often do critical spares cause unplanned downtime?

04 · DEAD STOCK & EXCESS

What % of your MRO inventory value is dormant or obsolete?

05 · DATA & BOM LINKAGE

How clean is your material master & asset-to-spare linkage?

06 · PREDICTIVE & WORK ORDER

How integrated is predictive maintenance with inventory?

0out of 100

YOUR MATURITY TIER

Dimension breakdown

Run a POC on your actual data

Send us a sample of your spare parts master (anonymized is fine). We'll run criticality, dead-stock detection, and forecast accuracy — then walk you through results.

Email me the PDF report

The full 48-page benchmark with industry-specific tiers and maturity roadmap.

Send me the report →
50%+
of downtime tied to spare part unavailability
11–35%
of industrial OPEX sits in maintenance inventory
~25%
of that inventory is dead stock, on average
25+
ERP-level parameters in MRO360 criticality
ALSO FROM VERDANTIS · MDM SUITE

Messy material master? That's often the real bottleneck.

Most Reactive and Emerging tiers on the Maturity Index fail at the data layer first. The Verdantis MDM SuiteHarmonize for legacy cleanup, Integrity for ongoing governance — is the plug-and-play foundation behind MRO360's accuracy. Purpose-built for industrial material, equipment, and supplier data.

Harmonize — Cleanse Integrity — Govern
Explore MDM Suite

Before you hit send.

What MRO and reliability leads usually ask before a first conversation.

Is the Spare Parts Maturity Index Report actually free?
Yes — zero cost, no paywall. We use industry-level findings to seed conversations with reliability and maintenance leaders. Fill the form and it's in your inbox within 4 business hours, delivered directly by a solutions specialist (not a no-reply bot).
What does an MRO360 POC actually look like?
A typical POC takes 2–4 weeks. You send us a sample of your spare parts master, a subset of historical work orders, and (optionally) a few asset BOMs. We run criticality analysis, dead-stock detection, and forecast accuracy for 1 plant — then walk you through the output, the logic, and the gaps in your data. No deployment, no IT change.
Which EAM/ERP systems does MRO360 integrate with?
SAP S/4HANA, SAP ECC (MM-IM, MM-CBP, PM), Oracle EBS, IBM Maximo, Infor EAM, and other major platforms. Integration is via native connectors — no custom builds required for standard use cases.
How long is a full rollout across multiple plants?
MRO360 deployments typically run 8–14 weeks for the first plant, with subsequent plants at 4–6 weeks each. Criticality learning from plant 1 rolls into plant 2 — that's the point.
We have bigger data-quality problems than spares alone. Relevant?
Yes — Verdantis MDM Suite is the sister product to MRO360 and is often deployed first or in parallel. Harmonize cleanses legacy material, equipment, and supplier master data; Integrity governs new creation with configurable approval workflows. Most customers who eventually run MRO360 at full maturity have one or both MDM modules underneath.
Your data is secure and used solely for intended purposes. We prioritize your privacy and protect your information.