Seul un sur dix de vos matériaux MRO fait l'objet d'une planification. Les neuf autres vous coûtent cher.

Table des matières

A food manufacturer with 40 plants recently pulled two numbers from SAP. The first: about 1.7 million material-plant records in the MRO master. The second: the materials under active reorder-point planning – roughly one in ten. Nobody had decided that the other 90% should sit outside planning. It had happened gradually, one plant and one year at a time.
This is the inventory problem that conventional MRO inventory optimization programmes often miss. The issue is not simply how much stock a manufacturer holds. It is how much of its material base is actually governed by a replenishment policy.

ndustrial warehouse shelves representing MRO inventory optimization and SAP material planning gaps

TL;DR

  • In many multi-plant manufacturers, only about 10% of MRO material-plant records are under active replenishment planning. The remaining records may still carry stock, value and duplicates that no reorder point will address.
  • You can establish your own ratio in SAP by comparing total material-plant records with records assigned a planning-relevant MRP type, then examining stock on hand for the unplanned set.
  • The safest starting point is not a network-wide programme. It is one plant, a structured calibration period and planner review of every recommendation before the approach is extended to other facilities.

MRO Material Planning in SAP: How Many Materials Are Actually Being Planned?

Fewer materials are actively planned than most manufacturers expect. An MRO material master expands through ordinary operational decisions: a part is created for a project, extended to a plant, purchased once and never retired. Mergers introduce additional numbering schemes. Plant autonomy creates local records for materials that may already exist elsewhere in the network.
After a decade of these decisions, the master can contain millions of material-plant combinations. Yet only the records governed by a replenishment method, such as reorder-point planning or another planning-relevant MRP type, are actively managed through those parameters. Other records may be deliberately non-stock, but many are simply outside the planning process.
The ratio is a useful diagnostic, not a universal performance benchmark. In the source example, roughly one in ten records was under active planning. A ratio closer to one in five may indicate broader planning coverage in some environments, while one in twenty points to a much larger review requirement. The right interpretation depends on the material population, operating model and the proportion intentionally managed as non-stock.
A practical first check: ask your SAP team for two counts: total material-plant records and records assigned a planning-relevant MRP type. The source draft lists VB, VM, V1, V2 and PD as examples; validate the relevant types against your SAP configuration before using them in the extract. Compare the two counts, then examine stock on hand for the unplanned set.
That comparison gives the materials team a starting point for MRO inventory analysis: the scale of the unplanned population, the stock value attached to it and the records that warrant further review.

The Cost of Unplanned MRO Inventory

An unplanned material is not necessarily an empty bin. A material can sit outside reorder-point planning and still carry stock, value on the balance sheet and have an equivalent part recorded under another number at a different plant. This is why unplanned MRO materials can create cost even when no immediate stock-out is visible.
Three costs tend to follow:

  • Dead stock and excess holdings. Materials outside active planning may retain stock without a parameter that triggers a structured replenishment or reduction review. Excess and obsolete inventory can remain in the storeroom because no planning rule is recalculating what the plant needs.
  • Duplicate purchasing across plants. The same bearing or other spare part may exist under multiple material numbers across facilities. Without a network-level view, each plant can purchase locally even when usable stock is available elsewhere. The result can be avoidable buying, transfers that are never considered and, at times, emergency procurement.
  • Planner attention directed at the visible minority. Exception messages and parameter reviews tend to concentrate on the materials already inside the planning process. The unplanned population can remain outside routine scrutiny, even when it represents substantial working capital.

These costs do not always appear as a direct write-off. They can accumulate as working capital tied up in slow-moving stock, avoidable purchase orders and material records that obscure what the network already owns.
The source draft references benchmarks of 25–40% for excess and obsolete MRO holdings and emergency purchasing premiums of 50–80%. Those figures should be supported by verifiable sources before publication; otherwise, retain the cost mechanisms without publishing the unsourced ranges.

See Your Data in Action

See what a six-week, one-plant calibration pilot could look like on your data. Book a 30-minute scoping call.

Prenez rendez-vous pour un entretien téléphonique sans engagement avec notre équipe de mise en œuvre afin d'aborder les défis liés à la gestion des données de référence

MRO Inventory Optimization Across Multiple Plants

A multi-site inventory optimization programme does not need to begin across the entire network. Starting with every plant at once increases the number of local rules, data conditions and planner exceptions that must be reconciled before the approach has been calibrated.
The manufacturers that make progress start with one representative plant. They use the first deployment to understand how planners apply criticality, safety stock, lead-time assumptions and reorder points. The configuration is reviewed against operational judgement before it is carried to the next facility.
A six-week, one-plant calibration can be structured as follows:

Period Activity Résultat
Week 1 Agree the data template and run a workshop with planners on current safety-stock, criticality and reorder-point practices. Documented planning rules and agreed data requirements.
Week 2 Load the plant extract and score data quality by field. Review preliminary outputs alongside current values. Baseline data-quality view and initial comparison.
Weeks 3–5 Recompute forecasts, safety stock, reorder points and min/max levels for the plant. Review overstock and understock variances and assess critical items with planners. Reviewed recommendations and documented exceptions.
Week 6 Conduct a readout with materials and reliability teams, benchmark the approach and estimate the effort required to scale. Calibrated configuration and a network scale-up estimate.

How can manufacturers identify duplicate spare parts across multiple plants?Each recommendation should carry its supporting evidence and an approve/reject decision. A rejection is not simply a failed recommendation; it records where the model’s assumptions differ from the plant’s operating reality. Planner feedback becomes part of the calibration process. The next plant can then start from a reviewed configuration rather than repeating the same discovery work.
This is the practical distinction between isolated plant-level MRO inventory management and a repeatable multi-plant spare parts management approach: local operating rules are understood first, then translated into a controlled method that can be evaluated across facilities.

MRO Inventory Planning Recommendations: What Should You Do This Week?

  1. Establish the baseline. Pull the total material-plant record count and the count assigned a planning-relevant MRP type. Calculate the share under active planning and identify the unplanned population.
  2. Quantify the exposure. For the unplanned set, examine stock on hand, inventory value and last movement date. This separates records with no stock from materials that may be tying up working capital.
  3. Choose a representative pilot plant. Prioritize a facility where transaction volume, purchase-order cancellations or inter-plant transfers could make the review operationally meaningful.
  4. Protect critical spares. Agree which critical items must be shielded from indiscriminate inventory reduction. Make the rule explicit and require every recommendation to demonstrate how it treats those items.
  5. Make recommendations explainable. Require the current parameter, proposed parameter and supporting reason to be visible side by side. If planners cannot assess the recommendation, adoption will be limited.

The objective is not to reduce every stock balance. It is to improve MRO inventory management by distinguishing justified inventory from stock that has accumulated without a current planning rationale.

How Verdantis Approaches the Planning Gap

Verdantis approaches this problem through a plant-first calibration process supported by MRO360. The work begins with the material and plant data, then evaluates planning parameters and inventory conditions against the rules used by the materials and reliability teams.
Recommendations are presented for planner review, with evidence and an approve/reject decision. That review is central to the process: the aim is to establish a configuration that reflects the plant’s operating requirements before extending it to other facilities. This supports MRO inventory reduction through better planning, stock redeployment and replenishment decisions rather than treating write-offs as the default route.
See what a six-week, one-plant calibration pilot could look like on your data. Book a 30-minute scoping call

Foire aux questions

1. What are unplanned MRO materials in SAP?

An unplanned MRO material is a material-plant record that is not governed by a planning-relevant MRP type or replenishment parameter. It may still hold stock and inventory value; it is simply outside the automated replenishment logic and may be absent from routine planning reviews.

2. How do you conduct MRO inventory analysis?

Start by comparing total material-plant records with records assigned a planning-relevant MRP type. For the unplanned set, add stock on hand, inventory value and last movement date. This provides an initial view of the population, its financial exposure and its dormancy. Validate the extract and planning-type definitions against your SAP configuration.

3. How can MRO inventory reduction happen without write-offs?

Potential actions include redeploying usable stock between plants, cancelling open purchase orders where network stock can meet demand, returning eligible excess to vendors and adjusting replenishment parameters so inventory is consumed down. Write-offs may still be necessary in some cases, but they should not be assumed to be the first or only option.

4. How do you approach multi-plant MRO inventory optimization? 

Begin with one representative plant, review the data and planning rules with local teams, and calibrate recommendations through planner approval. Once the approach reflects the plant’s operating requirements, carry the reviewed configuration to other facilities and account for their local differences

5. How does MRO inventory optimization help reduce excess stock?

MRO inventory optimization analyzes demand patterns, reorder points, safety stock, supplier lead times and inventory availability to identify excess materials and improve replenishment decisions.

6. How can manufacturers identify duplicate spare parts across multiple plants?

Manufacturers can analyze material descriptions, part numbers, specifications and stock availability across facilities to identify duplicate records and opportunities for inventory consolidation or inter-plant transfers. 

7. How does MRO inventory optimization help reduce excess stock?

MRO inventory optimization analyzes demand patterns, reorder points, safety stock, supplier lead times and inventory availability to identify excess materials and improve replenishment decisions.

8. How can manufacturers identify duplicate spare parts across multiple plants?

Manufacturers can analyze material descriptions, part numbers, specifications and stock availability across facilities to identify duplicate records and opportunities for inventory consolidation or inter-plant transfers

A Two-Number Diagnostic for Your MRO Inventory

Your plants may be holding materials that have never been brought into a formal planning process. Start with two SAP counts: total material-plant records and records assigned a planning-relevant MRP type. Share the figures with Verdantis to understand what the gap may indicate and where a one-plant review could begin.
Download the MRO360 data template to see which fields the six-week pilot requires from SAP.

À propos de l'auteur

Photo de Kumar Gaurav

Kumar Gaurav

En tant que PDG de Verdantis, Kumar joue un rôle central dans la définition de l’orientation stratégique de l’entreprise, le renforcement de sa présence sur le marché et la promotion de l’innovation dans le domaine de la gestion des données de référence. Kumar est un entrepreneur chevronné et un leader transformateur fort de plus de deux décennies d’expérience. Il est spécialisé dans l’accompagnement des clients tout au long de leur transformation numérique grâce à des solutions innovantes. Fort d’une solide expérience en direction commerciale et en gestion de conglomérats complexes, Kumar excelle dans la gestion du compte de résultat. Il est reconnu pour ses conseils stratégiques dans les secteurs de la distribution, du commerce électronique et de l’éducation, ainsi que pour son habileté à fédérer diverses parties prenantes autour d’objectifs communs au sein de structures organisationnelles matricielles.

Articles similaires

Réserver une démonstration

Télécharger le fichier

Vos données sont protégées chez nous par notre accord de confidentialité 100%.

Gestion des données de référence MRO pour une entreprise leader du secteur pétrolier et gazier (chiffre d'affaires : $12Bn)

Les entreprises du secteur pétrolier et gazier doivent faire face à d’énormes coûts indésirables sous forme de pertes, d’amendes et d’indemnités liées aux accidents du travail, qui grèvent considérablement leurs revenus. L'une des principales causes des défaillances et des accidents réside dans la défaillance d'infrastructures industrielles clés, due à une gestion inefficace du parc matériel et à des dysfonctionnements au sein de la chaîne d'approvisionnement MRO, qui revêtent une importance cruciale pour les cycles de production et de maintenance.

De plus en plus d'organisations cherchent aujourd'hui à mettre en place des solutions de gestion des données de référence (MDM) afin de gérer leurs actifs grâce à une prise de décision éclairée, fondée sur des données fiables, et de garantir une sécurité industrielle optimale à l'échelle de l'entreprise.

À propos de l'entreprise :

Ceci Cette entreprise basée aux États-Unis est un leader mondial en fournissant des composants mécaniques essentiels destinés aux plates-formes de forage terrestres et offshore, des installations complètes de forage et d'entretien de puits, ainsi qu'une gamme complète de solutions d'inspection des tubes, de revêtements internes, d'équipements pour colonnes de forage, de matériel de levage et de manutention, et d'outils de forage de fond de trou. L'entreprise propose également des services de chaîne d'approvisionnement via des centres de distribution stratégiquement situés à proximité des principaux sites de forage et de production à travers le monde. Avec plus de 800 sites de production, de vente et de service après-vente à travers le monde et le chiffre d'affaires annuel supérieur à $12 milliards, l'entreprise propose des solutions axées sur le client et adaptées aux exigences du secteur de l'énergie en matière de qualité, de productivité et de respect de l'environnement.

Défis liés aux données de base des articles

L'entreprise a dû faire face à des défis de taille concernant ses données de référence.
• Manque de cohérence et de normes concernant les données de référence
• Champs d'attributs de la base de données de référence incorrects, incomplets, non classés ou obsolètes
données : Volumes importants de données en plusieurs langues
• Plusieurs instances d'ERP et d'autres systèmes hérités réparties dans toute l'entreprise
• Descriptions des produits mal structurées
• Absence de gouvernance des données et de collaboration entre les services transversaux et les différents sites

Solution et résultats obtenus

Solution : harmonisation des données de base des articles et mise à jour continue

L'entreprise a mis en place Matériau Verdantis Harmonize pour nettoyer et enrichir ses données de référence historiques. À l'aide d'outils basés sur l'IA et de la Référentiel de contenu Verdantis, cette solution a permis de classer, de normaliser et d'éliminer les doublons.

Une fois les données harmonisées, Intégrité des matériaux Verdantis a été mis en place pour assurer la gouvernance continue des données. Il a permis de garantir en permanence l'exactitude des données grâce à validation en temps réel, classification basée sur l'IA et prévention des doublons, en garantissant une qualité élevée des données dans l'ensemble des systèmes de l'entreprise.

Principales mesures prises :

  • Confidentiel 150 000 documents en 1 210 UNSPSC et Plus de 500 HTS codes
  • Attributs des données non structurées analysés et normalisés
  • Suppression des doublons et amélioration des descriptions des articles
  • Mise en place d'une gouvernance des données en temps réel et de processus de validation
  • Mise en place d'un référentiel centralisé permettant l'accès aux données par l'ensemble des services

Résultats obtenus :

  • Amélioration de la précision des données – Suppression des enregistrements de matériel en double ou incohérents
  • Classification améliorée – Matériaux normalisés avec codes UNSPSC et HTS
    Une meilleure gestion des stocks – Visibilité et utilisation optimisées des stocks
  • Accélération des processus d'approvisionnement et de mise en conformité – A permis une recherche fluide des matériaux et le respect des réglementations
  • Gouvernance durable des données – Garantie d'une précision constante grâce à une maintenance pilotée par l'IA
  • Prise de décision éclairée – Référentiel de données centralisé pour une meilleure efficacité opérationnelle

En intégrant Harmonisation des matériaux et intégrité des matériaux, l'entreprise a réalisé un cadre de gestion des données de référence évolutif et basé sur l'IA, garantissant ainsi à long terme cohérence des données, efficacité et conformité.

Vos données sont en sécurité et utilisées exclusivement aux fins prévues. Nous accordons la priorité à la protection de votre vie privée et veillons à la sécurité de vos informations.