MRO360 Case Study · Chemicals & Process Industries

Risikominderung bei der Instandhaltung von Chemieanlagen

Working capital, downtime, and compliance in one deployment, across a multi-plant specialty chemicals network running lithium, bromine, and catalyst production lines.

Chemical plant maintenance and reliability operations
Go-Live8–12 wksTime to first go-live, per site
Kapital$10–40MWorking capital release range
Beschaffung40–60%Emergency spend reduction
Ausfallzeit25–40%Unplanned downtime reduction
The Situation

Nine plants running independently, one intelligence layer to unify them

Spare parts, criticality, and maintenance planning had been managed independently across roughly 18 sites on a mix of SAP and legacy CMMS platforms, the pattern typical of Ersatzteilmanagement run plant by plant rather than as one network.
Working capital sat locked in duplicated inventory, emergency procurement carried a heavy cost premium, and safety-critical rotating equipment was exposed to stockout risk with no enterprise-wide visibility to catch it. MRO360 was deployed as an intelligence layer above the existing systems, with nothing replaced and no disruption to plant operations.

Why this matters at board level

In a continuous chemical process, a stockout on a certified part is not only a cost event. It is a potential safety, environmental, and regulatory event, carried independently at every plant in the network until now.

Headquarters
Charlotte, North Carolina
Employees
~8,000–8,500
Plant Network
~18 sites, 4 regions
Product Lines
Lithium, bromine, catalysts
Full Case Study

Get the complete de-risking breakdown

The download covers the full technical detail behind this deployment, module by module, along with the governance model that let it run without touching a single plant's ERP.

  • All nine Spare Parts Management modules, with the operational reality each one solved
  • The Work Order Management rollout and how it plugged into the existing modules
  • The complete before-and-after results table, plus what made adoption stick across 18 sites

Laden Sie die Fallstudie herunter

Erfahren Sie die ganze Geschichte hinter dieser Umgestaltung.

Ihre Angaben werden nur zur Weiterleitung dieser Konversation verwendet. Siehe unser Datenschutzbestimmungen .

What Was Deployed

Nine Spare Parts Management modules, plus Work Order Management

All nine modules were deployed in full, none descoped, spanning visibility, criticality, working capital, and network-wide forecasting and planning.

Foundation

Visibility & Criticality

Finding any part across every plant, and scoring both equipment and parts by real Kritikalität, not spend alone.

Modules 1–3
Betriebskapital

Obsolescence & Stock Health

Clearing dead stock and discontinued parts before they become write-offs or unplanned exposure.

Modules 4–5
Network Intelligence

Forecasting, Planning & Transfer

Forecasting demand against the real turnaround calendar, setting living reorder points, and moving surplus Bestand between plants before a new purchase order is raised.

Modules 6–9
Separate SolutionVerwaltung von Arbeitsaufträgen, an MRO360 work order management solution distinct from the nine modules above, was deployed alongside them to carry parts criticality and certification context through the full work order lifecycle, from creation to technician close-out.
Ergebnisse

What changed in the first 12 months

Die MRO360 deployment falls within the ranges documented for comparable chemicals and petrochemical customers.

BereichErgebnis
Working capital in MRO inventory$10M to $40M released
Emergency procurementReduced 40% to 60%
Ungeplante Ausfallzeiten25% to 40% reduction on safety-critical equipment
Turnaround parts availability99%+ at mobilisation
Demand forecast accuracyAbove 95% once tuned to the plant calendar

Ranges reflect outcomes MRO360 documents for comparable chemicals deployments. The full breakdown, module by module, is in the downloadable case study.

Was Sie lernen werden

In der vollständigen Fallstudie

  • How MRO360 connected independently run plants across an 18-site chemicals network in 8 to 12 weeks per site, with no ERP replacement and no parallel migration.
  • How process-safety-weighted Kritikalität der Vermögenswerte scoring flagged safety-critical SKUs on rotating equipment for certified-substitute-only resolution across every plant.
  • How dynamic reorder points replaced static, years-old SAP configurations simultaneously across all sites, eliminating both overstock and dangerous stock exposure on the same part numbers.
  • How inter-plant transfer intelligence reduced avoidable emergency procurement and increased visibility into kritische Ersatzteile already sitting in surplus elsewhere in the network.
  • How turnaround demand forecasting confirmed certified spares availability 6 to 8 weeks before mobilisation, closing the gap that reactive procurement strategies routinely miss.
  • How the model compounds accuracy over time: correlated failure pattern recognition, supplier lead time calibration, and turnaround forecast refinement with every operational cycle.
Für wen dies gedacht ist

Built for the teams who own MRO and reliability in chemicals

Vizepräsident für Lieferkette und Zuverlässigkeit

Accountable for network-wide emergency spend, turnaround readiness, and inventory performance across multiple chemical plants.

MRO- und Beschaffungsmanager

Responsible for spare parts availability, stocking policy, and certified-substitute compliance across a multi-site SAP environment.

Planer für Instandhaltung und Werksreparaturen

Managing work order backlogs across chemical plants and confirming certified parts availability before every planned turnaround.

Führungskräfte in den Bereichen ERP und Betrieb

Einrichtung einer Intelligence-Ebene über bestehenden SAP-Instanzen, ohne dass ein Austausch, eine Migration oder eine Unterbrechung des IT-Betriebs erforderlich ist.

Considering something similar for your own network?

This case study covered the six operational pressures behind one deployment, all nine Spare Parts Management modules, the Work Order Management rollout, and the complete before-and-after results. If you're weighing where your own plants stand before a decision like this, start with a benchmark.

Ihre Daten sind sicher und werden nur für die vorgesehenen Zwecke verwendet. Wir legen Wert auf Ihre Privatsphäre und schützen Ihre Daten.