Global gold miner

Five mines, five SAP instances, one view of every spare.

~$26M
working capital released
47%
less emergency procurement
10 wks
to go live, SAP kept
Read the story
Product
Solutions
Customers
Resources
Company
Book a demoGet a free diagnostic
Maintenance technician working on plant equipment
MRO360 for maintenance and reliability

Spare parts for maintenance and reliability Parts ready before the job, and criticality you can defend.

For maintenance managers, reliability managers and heads of maintenance and reliability. MRO360 scores criticality from failure impact and checks every work order against live stock 10–14 days before it is released.

10–14 dayswork orders checked for missing parts before release
0critical parts missed at a gold miner's first shutdown after go-live

Most delays start in the storeroom, not on the job.

Planners find the missing part when the crew is already standing at the asset.

Parts found missing at the job

Work orders are released before anyone checks the bin. The gap shows up as a crew waiting and a breakdown that runs a shift longer.

Criticality nobody can defend

Ratings were set at go-live, or by whoever filled in the field. When budgets tighten, critical spares are the first to be questioned.

Shutdown lists in spreadsheets

Parts lists are rebuilt by hand for every outage, so gaps surface two to three weeks out, when only emergency channels are left.

Five modules maintenance teams start with.

All nine are available. These close the gap between the work order and the storeroom.

  1. Equipment CriticalityEvery asset rated on safety, production, environment and redundancy, with the drivers shown.
    Module
  2. Spare Part CriticalitySpares inherit their criticality from the equipment they keep running.
    Module
  3. Work Orders Planner and Vendor IntelligenceEvery work order checked against live stock 10–14 days ahead, with vendor lead times tracked.
    Module
  4. Demand ForecastingPlanned, breakdown and turnaround demand forecast separately.
    Module
  5. Work Order PlannerNotifications triaged and jobs made ready by an AI planner and scheduler. Add-on.
    Add-on
Conveyor at a processing plant

What changed at a five-mine operation.

A tier-1 gold and copper miner ran its next major shutdown, a 14-day SAG mill reline, with MRO360 checking every work order against stock across the network.

The shutdown before

Before

  • Parts list built on spreadsheets
  • 3 emergency procurement events
  • 2-day overrun, about $2.4M in lost production
The first two after go-live

With MRO360

  • Every part confirmed six weeks before mobilisation
  • SAG mill reline: no emergency procurement
  • Crusher overhaul: zero emergency orders, against 5–7 for the same scope before
Read the full deployment storyFive mines on three continents, five SAP ECC instances, all nine modules live in ten weeks.
Read the case study

Further reading for maintenance and reliability teams

Questions from maintenance and reliability teams

Does MRO360 replace our CMMS or SAP PM?

No. It reads work orders, notifications and stock from SAP, Maximo or your current system, and writes approved changes back. Your planners keep working where they work today.

How is criticality calculated?

Each asset is rated on safety, production, environment and redundancy, and every spare inherits its score from the equipment it protects. The drivers are shown, so a reliability engineer can challenge or approve each rating.

Who approves the changes?

A named planner reviews each recommendation and an approver signs off before anything is written back to the ERP. Every decision is logged with who made it and why.

See which work orders are exposed.

Send one standard ERP extract. We return criticality gaps and the open work orders at risk of a missing part, each valued in dollars.

Material master + movements extract
Criticality gapsExposed work ordersMissing parts
  • Critical equipment with spares too thin to cover a failure
  • Open work orders whose parts are not in stock
  • Lead times rebuilt from actual receipts

Request a free diagnostic

Free for maintenance and reliability teams. An MRO specialist will walk you through the findings.

Request received. Pick a time for your kickoff call.

A short call with an MRO specialist. We'll also email a secure link for your extract.

Open the calendar in a new tab

Book A Demo

MRO Master Data Management for a leading $12Bn Oil and Gas company

Oil and Gas organizations face huge unwanted costs in the form of losses, penalties and compensation due to industrial accidents, taking a sizable chunk of their revenues. One of the important reasons for failures and accidents is the breakdown of key industrial infrastructure arising from ineffective management of the material base and inefficiencies in the MRO supply chain that are highly critical for the production and maintenance cycles.

More and more organizations are now looking to establish Master Data Management (MDM) implementations in order to manage their assets through informed decision-making based on reliable data and ensure optimal industrial safety across the enterprise.

About the company:

This US based company is a global leader in providing essential mechanical components for both land and offshore drilling rigs, complete drilling and well servicing rigs, as well as a comprehensive range of tubular inspection, internal coatings, drill string equipment, lifting and handling gear, and downhole drilling tools. It also offers supply chain services through distribution centers strategically located near major drilling and production sites worldwide. With over 800 manufacturing, sales, and service centers globally and annual revenues exceeding $12 billion, the company delivers customer-focused solutions tailored to meet the energy industry’s quality, productivity, and environmental needs.

Material Master Data Challenges

The company faced significant challenges with their master data.
• Lack of consistency and standards for the master data
• Incorrect, incomplete, unclassified and outdated attribute fields of master
data High volumes of data in multiple languages
• Multiple ERP and other legacy instances across the company
• Poorly structured material descriptions
• Lack of data governance and collaboration across cross-functional divisions and locations

Solution & Results Achieved

Solution: Material Master Data Harmonization & Ongoing Maintenance

The company implemented Verdantis Material Harmonize to cleanse and enrich its historical material master data. Using AI-powered tools and the Verdantis Content Repository, the solution classified, standardized, and eliminated duplicate materials.

Once the data was harmonized, Verdantis Material Integrity was deployed for ongoing data governance. It ensured continuous data accuracy through real-time validation, AI-driven classification, and duplication prevention, maintaining high data quality across enterprise systems.

Key Actions Taken:

  • Classified 150,000 materials into 1,210 UNSPSC and 500+ HTS codes
  • Parsed and normalized unstructured material attributes
  • Eliminated duplicates and enriched material descriptions
  • Established real-time data governance and approval workflows
  • Created a centralized repository for cross-functional data access

Results Achieved:

  • Improved Data Accuracy – Eliminated duplicate and inconsistent material records
  • Enhanced Classification – Standardized materials with UNSPSC & HTS codes
    Better Inventory Management – Optimized stock visibility and usage
  • Faster Procurement & Compliance – Enabled seamless material search & regulatory adherence
  • Sustainable Data Governance – Ensured ongoing accuracy with AI-driven maintenance
  • Informed Decision-Making – Centralized data repository for improved operational efficiency

By integrating Material Harmonize & Material Integrity, the company achieved a scalable, AI-powered Master Data Management framework, ensuring long-term data consistency, efficiency, and compliance.

Your data is secure and used solely for intended purposes. We prioritize your privacy and protect your information.