MRO360 is the parts-intelligence layer that keeps your preventive maintenance program executable. It works above your existing CMMS or EAM to confirm the right spare is on the shelf before every scheduled job. No system replacement. Deployed in 8 to 12 weeks.
Wo MRO360 heute zum Einsatz kommt: it keeps the parts side of your preventive maintenance program reliable, working above the CMMS or EAM you already run. Native preventive maintenance scheduling is in active development as an MRO360 module.
A preventive maintenance schedule is only as good as the parts behind it. When a scheduled job reaches the floor and the spare is missing, the PM slips, the asset waits, and planned work turns into an emergency. The schedule was never the weak link. The storeroom was.
Scheduled jobs are deferred because the required part is not on the shelf. Compliance metrics fall for a reason that has nothing to do with the schedule itself.
A PM that could have been supplied weeks ahead becomes an emergency buy at a premium, or waits while the asset sits idle.
Capital is locked in parts the PM program rarely consumes, while the parts it actually needs run short. Stocking policy and maintenance reality drift apart.
MRO360's agents read your maintenance and inventory data continuously, so every preventive and planned work order has its parts scored, forecasted, stocked, and confirmed before the schedule needs them.
Which parts actually protect my critical PMs?
Every spare is scored on the equipment it supports, its lead time, and how many vendors can supply it. Single-source, long-lead parts that a PM depends on are flagged, not buried in a C-class bucket.
Agent 3 · Kritikalität von ErsatzteilenHow much will my PM schedule consume, and when?
Demand is forecast from consumption and failure history, with preventive, corrective, and shutdown demand modelled separately rather than lumped into one average, up to two years out.
Agent 6 · NachfrageprognoseWill the part be on the shelf when the job is scheduled?
Reorder points, safety stock, and reorder dates recalculate dynamically against real supplier lead-time variability and each part's criticality, so scheduled work is supplied before it is due.
Agent 7 · NachbestellpunktIs this PM work order actually ready to release?
Before a work order releases, the agent checks on-hand stock and incoming POs against demand, and flags jobs at risk from short material or a low-reliability vendor.
Agent 8 · ArbeitsauftragsplanungCan I cover a gap without an emergency buy?
When a scheduled job is short, the agent finds the same part sitting as surplus at another plant and recommends an internal transfer before any external PO is raised.
Agent 9 · Transfer zwischen AnlagenWhich parts is my PM program no longer using?
Stock velocity and obsolescence agents surface dead stock and discontinued parts tied to retired assets or lapsed PMs, and recommend substitutes or disposition.
Agents 4 & 5 · Obsolescence + Stock VelocityMRO360 is live now as the parts-intelligence layer above your CMMS or EAM. Native preventive maintenance scheduling is in active development as an MRO360 module, with full maintenance execution to follow. Each track below is labeled by status, so it is clear what ships today and what is in build.
What this means for you today: you keep running preventive maintenance in the CMMS or EAM you already own. MRO360 makes the parts side of that program reliable now, while native preventive maintenance scheduling is being built into the platform as a module.
Buchen Sie eine Arbeitssitzung, und wir zeigen Ihnen, welche Informationen MRO360 aus Ihren eigenen Wartungs- und Bestandsunterlagen bereitstellt – von der Kritikalität über den Nachbestellpunkt bis hin zum werksübergreifenden Transfer.
Fordern Sie eine kostenlose Demo an[email protected] • +1 (866) 987-4463 • www.verdantis.com

Carnegie Center, Suite 300,
Princeton, NJ 08540, Tel: +1 (866) 987-4463

Times Square, 3. Stock, Flügel "B", Andheri Kurla Road,
Andheri Ost, Mumbai - 400059
Copyright © 2026. Alle Rechte vorbehalten.