Global gold miner

Five mines, five SAP instances, one view of every spare.

~$26M
working capital released
47%
less emergency procurement
10 wks
to go live, SAP kept
Read the story
Product
Solutions
Customers
Resources
Company
Book a demoGet a free diagnostic
Aerial view of an open-pit mine
Measured at 12 months Anonymised at the customer's request

Gold mining MRO case study Five mines, one view of every spare part.

A tier-1 gold and copper producer ran five mines on five SAP ECC instances with no shared view of MRO inventory. MRO360 went live across all of them in 10 weeks, without replacing SAP.

~$120MMRO inventory across five sites
5 SAP ECCinstances, none replaced
~$26Mworking capital released, 22% of a $120M inventory
47%less emergency procurement, from 34 orders a month to about 18
0critical parts missed at the first shutdown after go-live
10 wksto all nine modules live, without replacing SAP

The challenge.

  • Criticality with no enterprise viewA primary crusher or SAG mill stoppage costs $600K–$1.5M a day, yet each site scored criticality its own way.
  • Remote-site lead timesCritical OEM components took 12–18 weeks to reach two remote sites. Reorder points dated from SAP go-live.
  • Duplicate procurement across sites14 emergency orders in 12 months were for parts another site held in surplus.
  • Manual shutdown planningShutdown parts lists lived in spreadsheets; gaps surfaced two to three weeks before execution.
  • Fleet obsolescenceMore than 340 line items on 15-year-old haul trucks and crushers were at risk, with no qualified alternates on record.

Together these pressures added up to a documented $30M–$50M a year.

Annual exposure found in scoping
Downtime from stockouts$15M–$20M
Excess carrying cost$12M–$15M
Emergency procurement premiums$4M–$5M
Obsolescence write-offs$3M–$5M
Duplicate capital across sites$3M–$4M
Total$30M–$50M

What was deployed, and what it changed.

All nine modules, configured to the miner's fleet, sites and shutdown calendar.

Ten weeks, three phases.

  1. Weeks 1–3

    Data connection

    All five SAP ECC instances and regional warehouses connected. Material master, goods movements, work orders, asset register, POs and lead times loaded.

  2. Weeks 4–7

    Configuration

    Fleet criticality frameworks for haul trucks, mills and crushers. Remote-site lead-time multipliers applied. Results validated with maintenance and supply chain teams.

  3. Weeks 8–10

    Validation and go-live

    User acceptance at all five sites. First working-capital analysis. Reorder points presented for planner review and SAP write-back.

“We did not have an inventory problem; we had a visibility and connection problem. The parts that caused our emergency events were almost always somewhere in our network.”
Group VP Maintenance and Reliability
Prefer the long read?The full case study article covers the deployment in more detail, site by site.
Read the full case study

What would your network show?

This deployment started with one extract per site. Send yours and we'll size the same opportunities across your plants, in days.

One extract per site
Cross-site surplusExcessExposed criticals

Request a network assessment

Free for multi-site operators. Run with an MRO specialist.

Request received. Pick a time for your kickoff call.

A short call with an MRO specialist. We'll also email a secure link for your extract.

Open the calendar in a new tab

Book A Demo

MRO Master Data Management for a leading $12Bn Oil and Gas company

Oil and Gas organizations face huge unwanted costs in the form of losses, penalties and compensation due to industrial accidents, taking a sizable chunk of their revenues. One of the important reasons for failures and accidents is the breakdown of key industrial infrastructure arising from ineffective management of the material base and inefficiencies in the MRO supply chain that are highly critical for the production and maintenance cycles.

More and more organizations are now looking to establish Master Data Management (MDM) implementations in order to manage their assets through informed decision-making based on reliable data and ensure optimal industrial safety across the enterprise.

About the company:

This US based company is a global leader in providing essential mechanical components for both land and offshore drilling rigs, complete drilling and well servicing rigs, as well as a comprehensive range of tubular inspection, internal coatings, drill string equipment, lifting and handling gear, and downhole drilling tools. It also offers supply chain services through distribution centers strategically located near major drilling and production sites worldwide. With over 800 manufacturing, sales, and service centers globally and annual revenues exceeding $12 billion, the company delivers customer-focused solutions tailored to meet the energy industry’s quality, productivity, and environmental needs.

Material Master Data Challenges

The company faced significant challenges with their master data.
• Lack of consistency and standards for the master data
• Incorrect, incomplete, unclassified and outdated attribute fields of master
data High volumes of data in multiple languages
• Multiple ERP and other legacy instances across the company
• Poorly structured material descriptions
• Lack of data governance and collaboration across cross-functional divisions and locations

Solution & Results Achieved

Solution: Material Master Data Harmonization & Ongoing Maintenance

The company implemented Verdantis Material Harmonize to cleanse and enrich its historical material master data. Using AI-powered tools and the Verdantis Content Repository, the solution classified, standardized, and eliminated duplicate materials.

Once the data was harmonized, Verdantis Material Integrity was deployed for ongoing data governance. It ensured continuous data accuracy through real-time validation, AI-driven classification, and duplication prevention, maintaining high data quality across enterprise systems.

Key Actions Taken:

  • Classified 150,000 materials into 1,210 UNSPSC and 500+ HTS codes
  • Parsed and normalized unstructured material attributes
  • Eliminated duplicates and enriched material descriptions
  • Established real-time data governance and approval workflows
  • Created a centralized repository for cross-functional data access

Results Achieved:

  • Improved Data Accuracy – Eliminated duplicate and inconsistent material records
  • Enhanced Classification – Standardized materials with UNSPSC & HTS codes
    Better Inventory Management – Optimized stock visibility and usage
  • Faster Procurement & Compliance – Enabled seamless material search & regulatory adherence
  • Sustainable Data Governance – Ensured ongoing accuracy with AI-driven maintenance
  • Informed Decision-Making – Centralized data repository for improved operational efficiency

By integrating Material Harmonize & Material Integrity, the company achieved a scalable, AI-powered Master Data Management framework, ensuring long-term data consistency, efficiency, and compliance.

Your data is secure and used solely for intended purposes. We prioritize your privacy and protect your information.