Global gold miner

Five mines, five SAP instances, one view of every spare.

~$26M
working capital released
47%
less emergency procurement
10 wks
to go live, SAP kept
Read the story
Product
Solutions
Customers
Resources
Company
Book a demoGet a free diagnostic
Haul truck on a mine road
MRO360 for mining and metals

Mining spare parts management Keep crushers, mills and haul trucks running without overstocking.

Remote sites, 12–18-week lead times and ERP instances that don't talk to each other. MRO360 gives every mine one view of every spare part, and puts criticality and stock levels on one standard.

$600K–$1.5Ma day when a SAG mill or primary crusher stops
12–18 weekslead time for critical OEM components to site

Remote sites make every missing part expensive.

Mining carries some of the largest MRO inventories in industry, and still runs short on the parts that stop a mill.

Downtime is priced by the day

When a crusher or mill stops, the concentrator waits. So every site stocks heavily to avoid being the one that stopped it.

Replenishment runs through ports and haul roads

Master-data lead times rarely include customs and the last few hundred kilometres, so remote sites are under-protected on paper.

Shutdown lists live in spreadsheets

Missing and obsolete parts surface at mobilisation, two to three weeks out, when only emergency channels are left.

Five modules mining teams start with.

All nine are available. These are the ones that pay back first at a remote, multi-site operation.

  1. Equipment CriticalityRank crushers, mills, conveyors and the haul fleet on one standard across every site.
    Module
  2. Inter-Plant TransferSee the bearing in another mine's storeroom before airfreight is booked.
    Module
  3. Demand ForecastingSeparate shutdown demand from run-rate demand, so reline parts are forecast rather than guessed.
    Module
  4. Reorder Point ReviewLead times that include port, customs and haul road, not the master-data default.
    Module
  5. Work Orders Planner and Vendor IntelligenceEvery shutdown work order checked against live stock eight to ten weeks out.
    Module
Ore conveyor at a processing plant

The first shutdown after go‑live.

A tier-1 gold and copper miner ran its next major shutdown, a 14-day SAG mill reline at its largest site, with MRO360 checking every work order against stock across the network.

10 weeks outShutdown work orders checkedAgainst live stock at all five sites
6 weeks outEvery part confirmedGaps closed by transfer, alternate or order
MobilisationNo emergency ordersNothing found missing on the day
14 daysSAG mill reline completeWith every part on hand
Prior cycle

The shutdown before

  • Parts list built on spreadsheets
  • 3 emergency procurement events
  • 2-day overrun, about $2.4M in lost production
With MRO360

The first two after go-live

  • SAG mill reline: no emergency procurement
  • Crusher overhaul at a second site: zero emergency orders, against 5–7 for the same scope before
  • Network-wide emergency orders down from 34 to about 18 a month
Read the full deployment storyFive mines on three continents, five SAP ECC instances, all nine modules live in ten weeks.
Read the case study

Further reading on mining spare parts management

Questions from mining teams

Do our mines need to be on one SAP instance?

No. The reference deployment unified five separate SAP ECC instances without replacing any of them. MRO360 reads each site's system and writes approved values back to it.

How do you treat insurance spares that never move?

By consequence, not turnover. Each spare is scored from the equipment it protects, so a slow-moving mill motor is protected rather than flagged as dead stock.

How soon would a shutdown benefit?

The reference miner had all nine modules live in ten weeks. Its first major shutdown after go-live had every part confirmed six weeks before mobilisation.

See where your network is over and under.

Send standard extracts from each site. We return cross-site duplicates, under-protected criticals and transfer options, valued per mine.

One extract per mine site
Cross-site duplicatesExposed criticalsTransfers
  • The same part stocked under different numbers at different mines
  • Plant-down criticals with too little protection
  • Lead times rebuilt from actual receipts, including port and haul road

Request a network assessment

Free for multi-site mining operators. An MRO specialist with mining experience will run it with you.

Request received. Pick a time for your kickoff call.

A short call with an MRO specialist. We'll also email a secure link for your extract.

Open the calendar in a new tab

Book A Demo

MRO Master Data Management for a leading $12Bn Oil and Gas company

Oil and Gas organizations face huge unwanted costs in the form of losses, penalties and compensation due to industrial accidents, taking a sizable chunk of their revenues. One of the important reasons for failures and accidents is the breakdown of key industrial infrastructure arising from ineffective management of the material base and inefficiencies in the MRO supply chain that are highly critical for the production and maintenance cycles.

More and more organizations are now looking to establish Master Data Management (MDM) implementations in order to manage their assets through informed decision-making based on reliable data and ensure optimal industrial safety across the enterprise.

About the company:

This US based company is a global leader in providing essential mechanical components for both land and offshore drilling rigs, complete drilling and well servicing rigs, as well as a comprehensive range of tubular inspection, internal coatings, drill string equipment, lifting and handling gear, and downhole drilling tools. It also offers supply chain services through distribution centers strategically located near major drilling and production sites worldwide. With over 800 manufacturing, sales, and service centers globally and annual revenues exceeding $12 billion, the company delivers customer-focused solutions tailored to meet the energy industry’s quality, productivity, and environmental needs.

Material Master Data Challenges

The company faced significant challenges with their master data.
• Lack of consistency and standards for the master data
• Incorrect, incomplete, unclassified and outdated attribute fields of master
data High volumes of data in multiple languages
• Multiple ERP and other legacy instances across the company
• Poorly structured material descriptions
• Lack of data governance and collaboration across cross-functional divisions and locations

Solution & Results Achieved

Solution: Material Master Data Harmonization & Ongoing Maintenance

The company implemented Verdantis Material Harmonize to cleanse and enrich its historical material master data. Using AI-powered tools and the Verdantis Content Repository, the solution classified, standardized, and eliminated duplicate materials.

Once the data was harmonized, Verdantis Material Integrity was deployed for ongoing data governance. It ensured continuous data accuracy through real-time validation, AI-driven classification, and duplication prevention, maintaining high data quality across enterprise systems.

Key Actions Taken:

  • Classified 150,000 materials into 1,210 UNSPSC and 500+ HTS codes
  • Parsed and normalized unstructured material attributes
  • Eliminated duplicates and enriched material descriptions
  • Established real-time data governance and approval workflows
  • Created a centralized repository for cross-functional data access

Results Achieved:

  • Improved Data Accuracy – Eliminated duplicate and inconsistent material records
  • Enhanced Classification – Standardized materials with UNSPSC & HTS codes
    Better Inventory Management – Optimized stock visibility and usage
  • Faster Procurement & Compliance – Enabled seamless material search & regulatory adherence
  • Sustainable Data Governance – Ensured ongoing accuracy with AI-driven maintenance
  • Informed Decision-Making – Centralized data repository for improved operational efficiency

By integrating Material Harmonize & Material Integrity, the company achieved a scalable, AI-powered Master Data Management framework, ensuring long-term data consistency, efficiency, and compliance.

Your data is secure and used solely for intended purposes. We prioritize your privacy and protect your information.